⌘K
Facility Status
Sector 4 Processing
Live operational telemetry active. Select an equipment node in the 3D viewer to inspect isolated metrics.
Total Flow Rate
4,200 L/min
Active Power
1.4 MW
System Health
98.2%
Filtration Pump
Pump P-401
Online
Flow Rate
850 L/min
Impeller RPM
1,450
Bearing Vibration
2.1 mm/s
Cavitation Risk
Low
Data Grid
Facility Telemetry
Comprehensive live status of all active valves, pumps, and settling tanks across Sector 4.
Network Status
Telemetry Gateway Online
Sync: 0ms
| Asset ID | Type | Location | Status | Health | Last Service |
|---|
Monitoring
Alert Feed
Critical Priority
Pressure Drop Detected
Filtration Line B • Node V-409 • Drop: -4.2 bar
Recent Events
Vibration Anomaly
Pump P-402 bearing vibration exceeded 4.5 mm/s. Automated speed reduction applied.
12 mins agoChemical Dosing Refill Required
Flocculant Tank T-10 level below 15%. Procurement order draft generated.
2 hours agoRoutine Flush Complete
Line A backwash cycle finished successfully. Particles cleared.
4 hours agoOperations
Maintenance Schedule
Book New Job
Upcoming Sequence
Routine Pipe Flush - Line A
Assigned to: Operator Team 2 • Est. Duration: 45m
Tomorrow
Filter Media Replacement
Assigned to: External Contractor • Est. Duration: 4h
Oct 24